Nashik Infrastructure - Priority Corridor

Nashik Ring Road (Parikrama Marg)

नाशिक परिक्रमा मार्ग · Nashik Outer Ring Road (ORR) · MSIDC projectUnder construction as of September 2026, with land acquisition still finishing and an alignment inquiry ordered in July 2026. Reported length 66-77 km and cost ₹7,600-8,000 Cr including land. Check the latest official status before you buy.

Reported length (September 2026)
66-77 km
Reported cost incl. land
₹7,600-8,000 Cr
Status, September 2026
Under construction
Reported target, not confirmed
March 2027

What Is the Nashik Parikrama Marg?

The Nashik Outer Ring Road - officially called Nashik Parikrama Marg (नाशिक परिक्रमा मार्ग) - is a new ring road around Nashik city, about 66 to 77 km (66.15 km in the November 2025 state approval; 77.4 km in the January 2026 central funding report), executed by MSIDC (Maharashtra State Infrastructure Development Corporation) at a reported cost of about ₹7,600 to ₹8,000 crore in all, including land acquisition (reported November 2025 and September 2026).

Unlike road upgrades, this is a new alignment; the centrally funded stretch is reported as a four-lane road built for six lanes. It is meant to connect the radial highways entering Nashik: NH-3 (Mumbai-Agra), NH-60 (Nashik-Pune), Gangapur Road, Trimbak Road and the Dindori road.

Status as of September 2026: Under construction on seven packages where land is secured; land acquisition for the remaining sections was reported in its final phase (September 2026). March 2027 is a reported target, not a confirmed opening date, set ahead of the Simhastha Kumbh Mela. In July 2026 the state ordered an inquiry into an alleged change of alignment and land deals along the corridor. Treat corridor value as a development story, not a completed-road story.

Ring Road Route - Corridor by Corridor

The planned ring road encircles Nashik and links the radial highways.

StretchKey LocalitiesHighway Connection
NorthDindori Road, MhasrulDindori Road
NortheastAdgaon, Ojhar / Niphad approachNH-3 (Mumbai-Agra Hwy), Agra side
East / SoutheastNashik Road, Deolali, Sinnar approachNH-60 (Nashik-Pune)
South / SouthwestAmbad, Pathardi Phata, Igatpuri approachNH-3 (Mumbai-Agra Hwy), Mumbai side
WestSatpur MIDC periphery, Trimbak RoadTrimbak Road
NorthwestGangapur Road fringe, GovardhanGangapur Road

Directions are approximate, measured from the city centre · Full ring still under development · Confirm the final alignment notification for any survey number

Where to Buy

Ring Road Zones: What Each One Suits

What each zone suits, and what to check before you buy.

Industrial and logistics

Sinnar Corridor

Industrial and NA landNear Samruddhi Mahamarg

Planned ring road link close to the Samruddhi Mahamarg and Sinnar MIDC. Demand here comes mainly from industry, logistics and warehousing. Check MIDC or zone use, the NA order and power availability before buying.

View locality guide
Mid-budget residential

Dindori Road

Residential layouts and flatsCheck: layout approval

Residential corridor north of the city with planned ring road access. Plotted layouts and township projects are common here. Ask for the RERA number on any project, the layout approval and the access road status.

Enquire about listings
Long-horizon land

Trimbak Road / Belgaun Dhaga

Plotted layouts and farmlandCheck: final alignment

Planned ring road junction near Belgaun Dhaga and Savargaon, on the road to Trimbakeshwar, a Simhastha Kumbh 2027 site. Much of the land is agricultural, so check the 7/12 extract, zone certificate and NA order before you plan to build.

View locality guide
Agri and logistics land

Ojhar / Niphad

Agricultural and industrial landNear Ozar airport

Agricultural belt around Ozar airport with planned ring road access. Buyers here usually look at agri-processing, cold storage or logistics use. Check zone use, the access road and the NA order before buying.

Enquire about listings
Established residential

Gangapur Road (Fringe)

Flats and bungalowsMetro: proposed only

Settled residential corridor on the west side of the city. Once open, the ring road may take some through traffic off this corridor. The Nashik Metro corridor here is only proposed; any station premium is unproven until approval and funding are confirmed.

View locality guide
Logistics and residential

Nashik Road East

Flats and warehousing landNear Nashik Road station

Planned ring road and Samruddhi Mahamarg links could open this side for logistics and warehousing, alongside existing residential demand near the railway station. The Metro corridor here is only proposed, so do not pay extra for a future station.

View locality guide

Ring Road Impact Zones - What to Check

Prices vary widely by survey number, access and zoning, so this is a checklist, not a price list. Compare any asking price with recent registered sale prices in the same village or society.

AreaTypical StockCheck Before BuyingMain Link
Sinnar (plots)Industrial and NA plots, farmland7/12, NA order, MIDC or zone useSamruddhi Mahamarg, Sinnar MIDC
Nashik RoadFlats, shopsOC, RERA number for new projectsNashik Road railway station
Dindori RoadFlats, plotted layoutsLayout approval, RERA number, access roadPlanned ring road access
Gangapur RoadFlats, bungalowsOC, RERA number, society duesRing road fringe; Metro only proposed
Trimbak Road (plots)Plotted layouts, farmland7/12, NA order, layout approvalNashik-Trimbak Road
Igatpuri (farmland)Farmland, weekend-home plotsZone certificate, permitted use, eco-sensitive-zone statusSamruddhi Mahamarg, Mumbai-Agra highway
Ambad (industrial)Industrial sheds and plotsMIDC transfer rules, power load, OCAmbad MIDC

Not a price list. Ask for the 7/12 extract, zone certificate and recent registered sale deeds for the exact survey number before paying a token amount.

Big Picture

5 Factors Shaping Nashik's Property Market

The Ring Road is one factor among five. Each has a different status, from operational to proposed, so check where each one stands before you buy.

Nashik Ring Road (Parikrama Marg)

₹7,600-8,000 Cr (reported) · Under construction, September 2026

Ring road around the city, 66-77 km by different reports, meant to link the radial highways and take through traffic out of the centre. Under construction on seven packages where land is secured; land acquisition for the remaining sections was reported in its final phase (September 2026).

Simhastha Kumbh Mela 2027

₹22,181 Cr of works approved (reported, March 2026)

The Mela began with the flag hoisting on 31 October 2026 and runs to 24 July 2028, per the state schedule. Reported plans cover roads, ghats, railway stations, the airport and civic works, and a projection of over 12 crore (120 million) pilgrims, a projection reported in April 2026 that critics have questioned. Roads and bridges stay after the event; event-time demand does not.

Samruddhi Mahamarg

Mumbai-Nagpur expressway · Operational

Operational expressway passing through Nashik district near Sinnar and Igatpuri. It has improved road access from Mumbai for logistics and weekend-home buyers. Check actual drive times and tolls for your own route.

MIDC Industrial Base

Satpur / Ambad / Sinnar / Dindori

Established industrial areas with manufacturers and their suppliers. Industrial jobs are a steadier base for housing demand than any single project. Check the specific MIDC estate's transfer and use rules before buying industrial land.

Nashik Metro (Proposed)

Proposed · not approved (August 2026)

Proposed only: a Maha Metro light metro proposal sits in a draft Comprehensive Mobility Plan that was not yet approved (August 2026). No station exists and no construction has started. Any premium for homes near a future station is unproven until the project is approved and funded.

Before You Buy Near the Ring Road

Nobody can promise that a new road will raise prices, and plots near planned interchanges are often already priced on expectations. Compare the asking price with recent registered sale prices in the same village or society, check the final alignment notification, 7/12 extract, zone certificate, NA order and access road, and plan for delays. Past performance does not guarantee future returns.

How to Invest Near the Nashik Ring Road

  1. 01

    Shortlist by Confirmed Access

    Buyers often look at land near planned interchanges at Adgaon, Gangapur Road, Trimbak Road and Ojhar. Confirm the interchange in the final alignment notification first; a draft map is not enough.

  2. 02

    Verify Documents First

    Check 7/12 Utara, NA order (if building planned), zone certificate (eco-sensitive areas near Gangapur reservoir), Mojni, and encumbrance certificate. Eshaan Realty verifies all docs before listing.

  3. 03

    Plan for Delays

    Large road projects often take longer than first announced, and land acquisition can shift the route. Buy only what you can hold through delays, and judge the price against recent registered sales, not a completion date.

Nashik Ring Road - Frequently Asked Questions

Everything buyers and investors ask about the Nashik Parikrama Marg.

Sources and dates

Figures on this page are as of September 2026, from the sources below. Project figures are reported, not guaranteed, and can change; confirm the current status with the government body named before you rely on one. Re-checked every quarter.

  1. The Free Press Journal, Rs 8,000-crore Nashik ring road cleared ahead of 2027 Kumbh Mela; MSIDC to execute 66.15-km project, November 2025. Accessed 1 November 2026.
  2. Indian Infrastructure, MoRTH approves funds for Nashik Ring Road project in Maharashtra, January 2026. Accessed 1 November 2026.
  3. Swarajya, MSIDC accelerates Nashik ring road project with construction starting across seven stretches, September 2026. Accessed 1 November 2026.
  4. Swarajya, Maharashtra Launches 15-Day Probe Into Nashik Ring Road Project Amid Allegations Of Insider Deals And Land Acquisition Irregularities, July 2026. Accessed 2 November 2026.
  5. Grihik, Nashik could get a Rs 14,520 crore metro network, August 2026. Accessed 1 November 2026.
  6. PTI, via The Week, Simhastha Kumbh Mela to begin in Nashik-Trimbakeshwar on Oct 31 next year, June 2025. Accessed 1 November 2026.
  7. News On AIR (Prasar Bharati), President hoists flag to mark the start of Nashik-Trimbakeshwar Simhastha Kumbh Mela in Maharashtra, October 2026. Accessed 2 November 2026.
  8. The Free Press Journal, Rs 25,055 crore development plan approved for 2027 Nashik Kumbh Mela, October 2025. Accessed 1 November 2026.

Find Properties Near Nashik Ring Road

Listings along the Ring Road corridor: NA plots, agricultural land and residential plots. WhatsApp us or fill the form.

WhatsApp Now

Get in Touch

Expert guidance for your Nashik investments.

We use your details only to respond to this enquiry.